Posts

Showing posts from November, 2021

THE FRAMES OF No.5 AT J.C.K. BALTHANE

Image
16th November 2021  The frames of No.5 at J.C.K. in Balthane following preparation and return to the railway illustrating the condition of the bunker and rear buffer beam.  The frames of No.5 at J.C.K. in Balthane with the driving wheels still in spring green and the condition of the drivers' side water tanks to good effect. The frames of No.5 at J.C.K. in Balthane showing front end detail and cylinders with cladding condition and front buffer beam. The frames of No.5 at J.C.K. in Balthane showing drivers' side tanks with their patches and the uniquely shaped rear handrail on the bunker.