A LOOK AT No.5's BOILER IN PORT ERIN
The boiler at Port Erin Station prior to preparation and paintin 31st July 2021 On the small well-wagon after the application of red oxide paint 22nd August 2021 The iconic brass chimney numeral after top-coating the smokebox 4th September 2021.