CONTINUING WORKS 26th NOVEMBER

Yesterday's volunteer working party on No.5 spent time applying a second coat of black paint to the pony truck and a first coat behind the driving wheels on the drivers' side.  This involved having to do a section and then move the engine to move the spokes to get to the unpainted sections.  A top coat of green was also applied to the repaired fireman's side cylinder cladding and the cylinder drain cock rod was refitted, enabling the boiler to be dropped in.  The next working party is proposed for SATURDAY 3rd DECEMBER at Port St. Mary goods shed; if you can assist or would like to get involved please contact granttaylor@manx.net







 