Work continued on No.5 at Port St. Mary in the goods shed yesterday with time being spent taking stock in the cab of missing fittings. Removed to enable them to be repainted and to enable access to the frames behind them the fireman's cab steps and sand pipes were taken off. A limited amount of work will likely continue over Christmas