FURTHER PROGRESSION, 7th JANUARY

Excellent progress was made at Port St. Mary on 7th January with all the studs on the backhead of the boiler in the cab having been cleaned up, ready for re-fitting.  A replacement draincock rods and pins were re-fitted.  Elsewhere, The cab steps and back sand-pipe on the driver's side were removed, with the aid of a small propane torch.  The back of the steps were then refurbished with fresh paint. The reason for the steps' removal was to enable the frames on that side to be needle-gunned and painted, the section under the coal bunker between the frames was also started to be dealt with in this way. Also receiving attention was the steam turret on top of the boiler, which was needle gunned and painted in red oxide.  Undercoat was also applied to the exterior of the cab and roof. The next working party will be on SATURDAY 14th JANUARY, please contact granttaylor@manx.net for further information.